Fundão
Portugal
This plant, the twin to the Viseu project, was carried out and developed by ENSO, together with FTP, our local partner. It produces 120,000 MWh of renewable energy from forest biomass and contributes to the consumption of around 28,000 homes. We supplied the boiler, supervised ELECNOR (EPC contractor) in the execution contract, and, once it was built, we performed the operation and maintenance through Magestop.
Technical information:
-
Biomass-based electricity generating plant
-
Output 15 MWe
-
Location: Fundão, Portugal
-
EPC: Elecnor
-
Project Developer: ENSO Energy Environment & Sustainability (as Gestamp Biomass) – FTP
-
Main milestones of the project and the boiler supply:
- - Started: June 2017
- - Ended: June 2019
-
O&M: Magestop (ENSO-FPT)


Boiler and biomass conveyors

Metal structure during construction

Fundão’s O&M team (part of)

Fundão by night